BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ChamberMaster//Event Calendar 2.0//EN
METHOD:PUBLISH
X-PUBLISHED-TTL:P3D
REFRESH-INTERVAL:P3D
CALSCALE:GREGORIAN
BEGIN:VEVENT
DTSTART:20220824T220000Z
DTEND:20220825T000000Z
X-MICROSOFT-CDO-ALLDAYEVENT:FALSE
SUMMARY:Business After Hours - August 2022
DESCRIPTION:Have you been on the new I-70 yet??\n\n\n\n\nCome meet the company responsible for the amazing upgrade to one of the busiest road in Colorado!\n\nThis design-build-operate-maintain-finance (DBOMF) project rebuilt a 10-mile stretch of Interstate-70\, adding one new tolled express lane in each direction\, removing the aging 54-year-old viaduct\, lowering the interstate between Brighton and Colorado Boulevards\, and placing a four-acre park over a portion of the lowered interstate. The design\, submitted by Kiewit as a preferred alternate and selected by the client\, will be constructed with a life expectancy of 75-100 years.\n\nCentral 70 is an iconic revitalization of a highway corridor in Denver\, Colorado\, that\, to date\, has exceeded its capacity\, functionality and service life. The project scope includes constructing a 10-mile stretch of I-70 East\, adding one new tolled express lane in each direction\, removing the aging 54-year old viaduct\, lowering the interstate between Brighton and Colorado boulevards and placing a 4-acre park over a portion of the lowered interstate. When completed\, C70 will reduce congestion\, improve safety and better accommodate future growth along the vital I-70 transportation corridor.\n\nBy working with the general contractor to develop a unique payment curve and optimizing the utilization of external financing and milestone payments\, Kiewit successfully eliminated the need for short-term financing which ultimately saved over $18 million for the client. The project received Community Impact of the Year Award from American Road & Transportation Builders Association (ARTBA) in 2019 and Gold Awards in the Best Road/Bridge/Tunnel Project category and the Best Financial Structure category at the P3 Awards in 2018.\n\nKiewit Foundations performed approximately 1\,123 drilled shafts\, 615 grout columns and 32 secant pile shafts. Drilled shafts ranged from 42-inches to 60-inches at depths of 32- to 60-feet deep to help support a retaining wall for lowering the interstate between Brighton and Colorado Boulevards.\n\nKiewit also performed deep soil-mixed columns ranging from 2 to 8 feet in diameter for a complex storm and sewage drainage system below the water table.\n\n\nKiewit is one of North America's largest and most respected engineering and construction organizations. Kiewit's commitment to safety\, quality and environmental stewardship are ingrained in everything we do. It's visible in our core values\, the work that we build and in our people.\n\n\n\nPlease join the Kiewit team for a fun evening of relationship building\, food\, drink and fun!\n\n\n\nThis monthly event is a great way to meet other business professionals\, expand your network\, and unwind from a busy day!
X-ALT-DESC;FMTTYPE=text/html:<h1 style="text-align: center\;"><span font-size:="" font-variant-ligatures:="" open="" style="color: rgb(82\, 82\, 82)\; font-family: ">Have you been on the new I-70 yet??</span></h1>\n<span font-size:="" font-variant-ligatures:="" open="" style="color: rgb(82\, 82\, 82)\; font-family: "><img alt="" height="528" src="https://chambermaster.blob.core.windows.net/userfiles/UserFiles/chambers/7785/Image/BAH/1522_C-70-rendering-scaled.jpg" style="width: 675px\; height: 528px\;" width="675" /><br />\n<br />\n<span style="font-size:14px\;"><span style="font-family:verdana\;">Come meet the company responsible for the amazing upgrade to one of the busiest road in Colorado</span></span>!</span>\n\n<p font-variant-ligatures:="" none="" open="" outline:="" style="box-sizing: border-box\; overflow-wrap: break-word\; margin: 0px 0px 18px\; font-size: 18px\; line-height: 36px\; color: rgb(82\, 82\, 82)\; font-family: ">This design-build-operate-maintain-finance (DBOMF) project rebuilt a 10-mile stretch of Interstate-70\, adding one new tolled express lane in each direction\, removing the aging 54-year-old viaduct\, lowering the interstate between Brighton and Colorado Boulevards\, and placing a four-acre park over a portion of the lowered interstate. The design\, submitted by Kiewit as a preferred alternate and selected by the client\, will be constructed with a life expectancy of 75-100 years.</p>\n\n<p font-variant-ligatures:="" none="" open="" outline:="" style="box-sizing: border-box\; overflow-wrap: break-word\; margin: 0px 0px 18px\; font-size: 18px\; line-height: 36px\; color: rgb(82\, 82\, 82)\; font-family: ">Central 70 is an iconic revitalization of a highway corridor in Denver\, Colorado\, that\, to date\, has exceeded its capacity\, functionality and service life. The project scope includes constructing a 10-mile stretch of I-70 East\, adding one new tolled express lane in each direction\, removing the aging 54-year old viaduct\, lowering the interstate between Brighton and Colorado boulevards and placing a 4-acre park over a portion of the lowered interstate. When completed\, C70 will reduce congestion\, improve safety and better accommodate future growth along the vital I-70 transportation corridor.</p>\n\n<p font-variant-ligatures:="" none="" open="" outline:="" style="box-sizing: border-box\; overflow-wrap: break-word\; margin: 0px 0px 18px\; font-size: 18px\; line-height: 36px\; color: rgb(82\, 82\, 82)\; font-family: ">By working with the general contractor to develop a unique payment curve and optimizing the utilization of external financing and milestone payments\, Kiewit successfully eliminated the need for short-term financing which ultimately saved over $18 million for the client. The project received Community Impact of the Year Award from American Road &amp\; Transportation Builders Association (ARTBA) in 2019 and Gold Awards in the Best Road/Bridge/Tunnel Project category and the Best Financial Structure category at the P3 Awards in 2018.</p>\n\n<p font-variant-ligatures:="" none="" open="" outline:="" style="box-sizing: border-box\; overflow-wrap: break-word\; margin: 0px 0px 18px\; font-size: 18px\; line-height: 36px\; color: rgb(82\, 82\, 82)\; font-family: ">Kiewit Foundations performed approximately 1\,123 drilled shafts\, 615 grout columns and 32 secant pile shafts. Drilled shafts ranged from 42-inches to 60-inches at depths of 32- to 60-feet deep to help support a retaining wall for lowering the interstate between Brighton and Colorado Boulevards.</p>\n\n<p font-variant-ligatures:="" none="" open="" outline:="" style="box-sizing: border-box\; overflow-wrap: break-word\; margin: 0px\; font-size: 18px\; line-height: 36px\; color: rgb(82\, 82\, 82)\; font-family: ">Kiewit also performed deep soil-mixed columns ranging from 2 to 8 feet in diameter for a complex storm and sewage drainage system below the water table.</p>\n<br />\n<span style="font-size:16px\;"><span style="font-family:verdana\;"><span font-size:="" font-variant-ligatures:="" open="" style="color: rgb(82\, 82\, 82)\; font-family: ">Kiewit is one of North America&rsquo\;s largest and most respected engineering and construction organizations. Kiewit&rsquo\;s commitment to safety\, quality and environmental stewardship are ingrained in everything we do. It&rsquo\;s visible in our core values\, the work that we build and in our people.</span></span></span><br />\n<br />\n<span style="font-size:16px\;"><span style="font-family:verdana\;">Please join the Kiewit team for a fun evening of relationship building\, food\, drink and fun!</span><br />\n<br />\n<span style="font-family:verdana\;">This monthly event is a great way to meet other business professionals\, expand your network\, and unwind from a busy day!</span></span><br />\n<br />\n&nbsp\;
LOCATION:Kiewit
UID:e.7785.21001
SEQUENCE:3
DTSTAMP:20260422T210103Z
URL:https://members.douglascountychamber.org/events/details/business-after-hours-august-2022-21001
END:VEVENT

END:VCALENDAR
